Odoo ERP Migration in Egypt: How to Move from Excel and Legacy Systems Without Disrupting Your Business
Many businesses do not decide to replace an ERP system because everything suddenly stops working.
The decision usually happens much earlier.
Reports start requiring more manual work.
Different departments begin maintaining their own Excel files.
Finance has one version of the numbers while operations has another.
Warehouse balances need continuous reconciliation.
Sales information exists in one system, accounting in another, and management reporting depends on employees collecting data manually at the end of every month.
The existing system may still technically operate.
But the business has outgrown it.
For Egyptian companies expanding across branches, warehouses, factories, projects, legal entities, or large transaction volumes, this is often the point where ERP migration becomes a strategic decision rather than an IT project.
Migrating to Odoo ERP can provide an opportunity to replace fragmented tools with an integrated platform connecting finance, purchasing, inventory, sales, manufacturing, projects, CRM, and other business operations.
However, successful Odoo ERP migration in Egypt requires much more than transferring files from an old system into a new database.
It requires deciding what should move, what should change, what should disappear, and how the new ERP should support the next stage of the organization.
Perfect Tech delivers Odoo Enterprise ERP solutions in Egypt for organizations moving away from legacy ERP platforms, disconnected applications, and spreadsheet-dependent processes toward a more integrated operating model.
Why Egyptian Businesses Outgrow Their Existing Systems
Legacy systems rarely become unsuitable overnight.
The gap between the business and the software usually develops gradually.
A company may begin with basic accounting software.
As operations expand, inventory software is added.
Sales teams introduce spreadsheets or a separate CRM.
Manufacturing uses another application.
Management then creates Excel reports to combine information from all of them.
Eventually, employees spend a significant amount of time moving data between systems instead of using the data to make decisions.
The problem is not necessarily that every existing application is bad.
The problem is fragmentation.
When business information is distributed across separate systems, management can struggle to establish one reliable view of operations.
Typical signs include repeated data entry, spreadsheet-based reconciliation, inconsistent customer or product records, delayed management reporting, manual inventory corrections, limited integration between finance and operations, and a growing dependence on specific employees who understand how the disconnected processes fit together.
At this point, adding another isolated application often increases complexity instead of solving it.
The organization needs to reconsider the underlying ERP architecture.
What Is ERP Migration?
ERP migration is the process of moving business operations, data, workflows, and users from an existing technology environment into a new enterprise resource planning system.
That existing environment may be:
an older ERP platform,
separate accounting and inventory systems,
custom-developed software,
multiple disconnected applications,
or an organization heavily dependent on Excel.
But migration should not be understood as simply copying historical records.
A proper ERP migration typically involves several connected decisions around data, processes, integrations, controls, reporting, user permissions, localization, infrastructure, and organizational change.
If those decisions are ignored, a company can end up recreating the weaknesses of its old system inside a newer platform.
The objective should therefore not be:
“How do we move everything into Odoo?”
The better question is:
“How should our business operate after the migration, and what information do we need to support that model?”
Moving from Excel to Odoo ERP
Excel is extremely useful.
The problem begins when spreadsheets become the infrastructure of the company.
A growing business may have separate Excel files for purchasing, stock balances, sales forecasts, budgets, supplier prices, project costs, production planning, receivables, and management reporting.
Each spreadsheet may work individually.
Together, however, they can create an environment where the same information is manually maintained in several places.
One employee changes a product price.
Another spreadsheet still contains the old value.
A warehouse updates stock manually.
Finance receives the adjustment later.
A manager creates a report by combining five files received from different departments.
This creates delays and increases the possibility of inconsistent information.
Odoo provides native capabilities for importing business data from Excel and CSV files, including records such as contacts, products, bank statements, journal entries, and orders.
But importing an Excel file is only the technical part of the migration.
Before data is loaded into Odoo, the organization should determine whether that data is accurate, duplicated, outdated, incomplete, or structured correctly for the new ERP.
Moving poor-quality spreadsheet data into a new system does not solve the original problem.
It simply centralizes it.
Migrating from a Legacy ERP to Odoo
Moving from an existing ERP creates a different challenge.
A legacy system may contain years of customers, suppliers, products, transactions, accounting balances, inventory movements, fixed assets, projects, manufacturing records, and historical reports.
Not all of that data necessarily needs to be migrated in the same way.
Some information is operationally essential.
Some is required for financial reporting or compliance.
Some may only need to remain available in a historical archive.
And some may no longer provide useful business value.
This is why ERP migration requires a data strategy before technical migration begins.
For example, a company may decide to migrate:
active customers and suppliers,
current products and services,
opening accounting balances,
open receivables and payables,
current inventory,
open sales orders,
open purchase orders,
active projects,
fixed assets,
and selected historical transactions.
Older information could remain accessible through an archived database, reporting environment, or structured historical export depending on the organization's requirements.
The correct decision depends on the business, regulatory obligations, reporting needs, and migration architecture.
ERP Migration Is an Opportunity to Fix Broken Processes
One of the biggest mistakes in ERP migration is recreating every old workflow exactly as it existed.
If a purchasing process requires five unnecessary manual steps in the legacy environment, reproducing those same five steps in Odoo does not represent digital transformation.
It represents digital replication.
Migration creates an opportunity to examine how processes actually work.
Which approvals are genuinely necessary?
Which reports are still useful?
Which information is entered repeatedly?
Which spreadsheets exist because the current system cannot support the process?
Which customizations still reflect real business requirements?
Which ones exist only because the old system was inflexible?
This analysis should happen before configuration.
Perfect Tech's Enterprise ERP implementation approach in Egypt begins with understanding the AS-IS environment and designing a TO-BE architecture around the organization's entities, branches, warehouses, financial model, operational workflows, and reporting requirements.
That distinction is important.
The goal is not to make Odoo behave exactly like the old ERP.
The goal is to determine how Odoo should support the business going forward.
Start with an AS-IS Assessment
Before migration begins, the organization needs a clear picture of its current environment.
This means identifying not only the main ERP system but also the surrounding ecosystem.
A company may say that it uses one ERP, while the real operating environment includes:
the ERP,
Excel files,
custom databases,
standalone inventory tools,
external CRM systems,
banking platforms,
e-commerce platforms,
mobile applications,
business intelligence tools,
third-party logistics systems,
and manually exchanged files.
All of these relationships need to be understood before the migration architecture is finalized.
Otherwise, the new ERP may go live only for the company to discover that an essential operational workflow depended on a system or spreadsheet that was never included in the migration plan.
Define the TO-BE Odoo Architecture
Once the current environment is mapped, the next step is designing how the future environment should operate.
The TO-BE architecture determines which processes move into Odoo, which external systems remain, and how information should flow between them.
For an Egyptian enterprise, this may include:
Finance and Accounting,
Purchasing,
Inventory,
Sales,
CRM,
Manufacturing,
Projects,
Maintenance,
HR,
document workflows,
management reporting,
third-party integrations,
and Egyptian regulatory requirements.
The architecture should also consider the organization's legal entities, branches, warehouses, cost centers, currencies, approval hierarchy, and reporting model.
Perfect Tech's Odoo Enterprise ERP solutions in Egypt are designed around these enterprise structures rather than treating every organization as a single-company standard implementation.
Clean the Data Before You Migrate It
Data cleansing is one of the most important parts of ERP migration.
Over several years, an existing system can accumulate thousands of records that are no longer accurate.
A customer may appear three times under slightly different names.
The same supplier may exist under several accounts.
Inactive products remain available.
Product codes may follow inconsistent naming conventions.
Employee-created descriptions may vary from department to department.
Historical records may contain missing tax information or incorrect units of measure.
If this information is imported without preparation, the new ERP begins its life with the same structural problems.
Migration should therefore include a systematic review of master data.
Customers, vendors, products, accounts, warehouses, units of measure, taxes, employees, fixed assets, and other critical records should be standardized before the final import.
Odoo's official data import functionality allows organizations to import records using XLSX or CSV files and test mappings before completing the import.
Odoo also warns that imports are permanent, which makes validation and controlled testing particularly important before production data is loaded.
Do Not Migrate Everything Just Because You Can
More historical data does not automatically create a better ERP.
Moving unnecessary information increases migration complexity, validation effort, storage requirements, and testing scope.
The organization should define a clear migration policy.
For each type of data, ask:
Does the business need this information for current operations?
Is it required for reporting?
Is it needed for regulatory or audit purposes?
Does it need to exist as a live Odoo transaction?
Or does it simply need to remain accessible historically?
The answer may differ across modules.
Finance may require a particular historical structure.
Sales may only require active customer relationships and open orders.
Inventory may need current stock quantities and traceability information.
Manufacturing may require active Bills of Materials, routings, and product structures.
The migration approach should reflect those differences rather than applying one rule to every dataset.
Preserve Financial Integrity During ERP Migration
Finance is one of the most sensitive areas of ERP migration.
The new system must begin with a financial position that management can trust.
This means reconciling information before go-live.
Accounts receivable should reconcile with customer balances.
Accounts payable should reconcile with supplier balances.
Bank balances need to be validated.
Inventory valuation needs to align with the agreed financial position.
Fixed assets need accurate opening values.
General ledger opening balances need to match the closing position in the previous system.
Any discrepancy discovered during migration should be investigated rather than silently transferred into the new ERP.
For organizations seeking deeper integration between accounting and operations, Perfect Tech's Odoo Finance solutions focus on connecting financial management with purchasing, inventory, sales, projects, manufacturing, and enterprise reporting.
ERP migration should ultimately strengthen financial visibility, not simply reproduce old balances in a new interface.
Migrating Inventory and Warehouse Data
Inventory migration requires more than importing a product list.
The business needs to establish the correct starting inventory position for each relevant location.
Depending on the organization, this may involve multiple warehouses, internal locations, lots, serial numbers, batches, expiry dates, units of measure, and product categories.
Timing is critical.
If physical warehouse movements continue while the final inventory dataset is being prepared, the migrated balance may already be outdated by the time the new system goes live.
Companies therefore need a controlled cutover method.
This may involve a defined transaction freeze, synchronized final counts, reconciliation between the legacy system and physical inventory, and controlled opening quantities in Odoo.
For manufacturers and organizations with complex warehouse operations, migration planning should be coordinated with production and purchasing so that go-live does not disconnect material availability from operational demand.
Businesses with these requirements can explore Perfect Tech's Odoo Manufacturing ERP solutions, where inventory, procurement, production, quality, maintenance, and costing are designed as connected operational processes.
What Happens to Customizations?
Legacy ERP environments often contain years of custom development.
Some customizations are essential.
Others were created because the old software could not support a process that Odoo may now handle differently.
Migrating every customization automatically can significantly increase project complexity.
The organization should therefore evaluate each customization individually.
Does it solve a genuine business requirement?
Can standard Odoo functionality replace it?
Can the process itself be simplified?
Does the customization need to be redesigned?
Does another application now handle the requirement more effectively?
Only the customizations that still create business value should move forward.
This approach can reduce technical debt and create a cleaner ERP architecture after migration.
Odoo Version Upgrades Are Different from ERP Migration
There is an important distinction between migrating from another platform to Odoo and upgrading an existing Odoo database.
If a company already uses Odoo but is moving from an older Odoo release to a newer supported release, the process becomes an Odoo database upgrade.
Odoo defines an upgrade as moving a database from an older version to a newer supported version and provides an official Odoo upgrade framework for supported environments.
However, customized implementations may require additional work.
Custom modules, custom code, integrations, automated workflows, and third-party applications need to be reviewed for compatibility with the target version.
Odoo also provides upgrade scripts and utilities for handling module-level changes during technical upgrades.
This means an Odoo upgrade should still be treated as a structured project when the database contains significant customization.
Integrations Need Their Own Migration Plan
Modern ERP environments rarely operate in complete isolation.
The new Odoo system may need to exchange information with external applications such as e-commerce platforms, banking systems, logistics providers, customer portals, mobile applications, BI tools, or specialized industry software.
Integrations need to be identified early because they can influence the architecture of the entire migration.
Odoo provides APIs for external integration. In Odoo 19, the platform introduced the External JSON-2 API, which allows authorized external systems to interact with Odoo models and data.
This capability can support broader integration architectures, but technical implementation still needs careful design around authentication, access rights, performance, data ownership, and synchronization logic.
Perfect Tech's enterprise offering also includes integration with existing legacy systems through APIs, middleware, and custom connectors when organizations cannot replace every system during the initial ERP rollout.
This allows migration to happen strategically rather than forcing the company into an immediate all-or-nothing replacement.
Should You Replace Every Legacy System at Once?
Not necessarily.
For some businesses, a full replacement is appropriate.
For others, a phased migration creates lower operational risk.
A company might begin with finance, purchasing, inventory, and sales before introducing manufacturing, projects, HR, or additional entities.
Another organization might migrate one company or branch first before expanding across the group.
A manufacturer might prioritize supply chain and production.
A professional services organization may begin with finance, CRM, projects, and billing.
The sequence should depend on business priorities, process dependencies, organizational readiness, and risk.
This is why migration architecture matters more than simply choosing a go-live date.
Big-Bang vs Phased Odoo Migration
A big-bang migration moves the organization to the new environment at once.
This may provide a faster transition and avoid running two operational environments for an extended period.
However, it also concentrates implementation risk into one cutover.
A phased approach moves systems, processes, companies, modules, or locations progressively.
This can make organizational adoption easier and allow lessons from the first phase to improve later deployments.
But phased migration requires careful integration between old and new environments during the transition.
Neither strategy is universally better.
The right approach depends on transaction volumes, process dependencies, system complexity, data quality, organizational scale, and the company's tolerance for operational risk.
Large Egyptian organizations should make this decision during architecture and project planning rather than after configuration has already begun.
Testing Is Not Optional
ERP migration should never move directly from configuration to production.
Testing needs to verify both the system and the migrated information.
The organization should test complete business scenarios.
For example:
a quotation becomes a sales order,
inventory is reserved,
goods are delivered,
an invoice is generated,
payment is received,
and accounting entries appear correctly.
Procurement scenarios should also be tested from RFQ through purchase order, warehouse receipt, vendor bill, and payment.
Manufacturing should be tested from material availability through work orders, consumption, finished goods, and costing.
Finance should validate taxes, accounts, opening balances, receivables, payables, bank operations, and reporting.
Custom integrations need end-to-end testing.
And users need to verify that the migrated information makes sense operationally.
Odoo's technical documentation also emphasizes testing upgraded databases and custom modules during version upgrades rather than assuming that automated migration alone guarantees correct behavior. (odoo.com)
User Acceptance Testing Should Reflect Real Work
User Acceptance Testing, or UAT, should not consist of users simply logging into Odoo and confirming that screens open.
Teams should execute realistic daily processes.
Salespeople should create actual customer scenarios.
Procurement should test supplier workflows.
Warehouse teams should receive and deliver products.
Accountants should post and reconcile realistic transactions.
Manufacturing teams should execute production workflows.
Managers should generate the reports they expect to use after go-live.
This is where problems that were invisible during configuration often become obvious.
A field may technically exist but appear in the wrong place.
An approval rule may work but create unnecessary delays.
A report may contain all the data but not present it in the format management needs.
UAT exists to identify these issues before they reach production.
Train Users Before Go-Live
ERP migration changes how people work.
Even a technically successful system can struggle if employees do not understand the new processes.
Training should therefore focus on business workflows rather than generic software features.
A warehouse employee needs to understand how receiving changes.
A procurement user needs to understand the new approval process.
An accountant needs to understand how operational transactions affect accounting.
A sales employee needs to understand how quotations and orders interact with inventory and invoicing.
Managers need to understand how reporting changes.
Role-based training is generally more useful than showing every Odoo feature to every employee.
Users should learn the parts of the system they actually need to perform their responsibilities.
Plan the Cutover Carefully
The final transition from the old environment to Odoo is usually called the cutover.
This is the point when the migration plan becomes operational reality.
A cutover plan may define:
when transactions stop in the old system,
when final data is extracted,
when reconciliation occurs,
when opening balances are loaded,
when stock quantities are finalized,
when users receive production access,
when integrations switch to the new environment,
and how the team responds if a critical issue appears.
Timing matters.
A company with high daily transaction volumes may choose a low-activity period.
A manufacturer may coordinate cutover with production schedules.
A finance team may align the transition with a month-end or another accounting milestone.
The exact approach depends on the organization, but the cutover should be planned long before the actual go-live date.
Do Not Switch Off the Legacy System Too Early
Even after Odoo becomes the production system, the legacy environment may still contain valuable historical information.
Organizations should determine how historical records will remain accessible.
This does not necessarily mean allowing employees to continue transacting in the old system.
The legacy platform may become read-only.
Historical information may be exported to a reporting database.
Important documents may be archived.
Selected historical data may be migrated into Odoo.
The objective is to prevent operational use of the old system while preserving the information the organization genuinely needs.
Post-Go-Live Support Is Part of Migration
Go-live is not the end of an ERP migration.
The first weeks after deployment often reveal issues that could not be fully reproduced during testing.
Users may require additional guidance.
Approval flows may need refinement.
Reports may require adjustment.
Data inconsistencies may become visible.
Integration volumes may behave differently in production.
This is why structured post-go-live support, sometimes called hypercare, is important.
Perfect Tech's Enterprise ERP implementation framework in Egypt includes post-go-live support and continuous optimization as part of the implementation lifecycle.
The purpose is to stabilize the system and make sure the organization actually captures the operational value expected from the migration.
What Can Go Wrong During ERP Migration?
ERP migration risk usually comes from a combination of technology, data, processes, and people.
A technically correct migration can still fail if data is poor.
Clean data can still create problems if workflows were designed badly.
Good workflows can struggle if employees were not trained.
A well-trained team can still face disruption if integrations fail during cutover.
This is why migration should be managed as a business transformation project rather than an isolated IT task.
The organization needs clear ownership, governance, testing, reconciliation, user involvement, and decision-making throughout the migration lifecycle.
How to Reduce Migration Risk
The strongest way to reduce ERP migration risk is to make uncertainty visible early.
Map the existing environment before configuration.
Identify critical data before extraction.
Resolve duplicate records before import.
Document integrations before development.
Test full workflows before production.
Reconcile balances before go-live.
Train users before they receive production access.
Define responsibilities before the cutover begins.
And establish a clear escalation process for the first days after launch.
This does not eliminate every problem.
But it significantly reduces the number of surprises discovered when the business is already operating on the new ERP.
Why Odoo Can Be a Strong Replacement for Fragmented Systems
The value of Odoo is not simply that it provides multiple applications.
Its larger advantage is that those applications can operate within one connected ERP environment.
Sales activity can influence inventory.
Procurement can respond to replenishment requirements.
Warehouse movements can influence accounting and costing.
Manufacturing can consume inventory and generate finished products.
Projects can connect operational activity with billing and financial analysis.
Finance can receive transaction information from across the organization rather than waiting for manual consolidation.
This is especially relevant for businesses moving away from a collection of separate applications.
Migration is therefore not simply a technology replacement.
It creates an opportunity to establish a shared operational data model across the organization.
Odoo Migration for Manufacturing Companies in Egypt
Manufacturing migrations are typically more complex because production data has many dependencies.
Products connect to Bills of Materials.
Bills of Materials connect to components.
Components connect to suppliers and inventory.
Production orders affect material consumption.
Work centers influence capacity and scheduling.
Finished products affect inventory and accounting.
Cost structures depend on accurate master data and operational configuration.
This means manufacturing data cannot be migrated independently from purchasing, inventory, finance, and production processes.
Perfect Tech's Odoo Manufacturing solutions are designed around these relationships, enabling Egyptian manufacturers to connect production planning, procurement, warehouses, costing, quality, maintenance, and financial management within the same ERP architecture.
Odoo Migration for Multi-Company Organizations
Groups operating several companies face another layer of complexity.
The migration needs to determine which data belongs to each legal entity and which records should be shared.
Charts of accounts may differ.
Customers and suppliers may overlap.
Warehouses may belong to separate companies.
Intercompany transactions may need specific treatment.
Currencies and financial reporting requirements may vary.
Consolidated reporting may depend on consistent structures across the group.
A multi-company migration should therefore begin with enterprise architecture rather than with data import templates.
Perfect Tech's Odoo Enterprise ERP solutions in Egypt support organizations operating across companies, branches, warehouses, financial structures, and complex operational environments.
Why Choose Perfect Tech for Odoo ERP Migration in Egypt?
ERP migration requires a combination of business analysis, accounting knowledge, data migration, Odoo configuration, technical development, integration, testing, training, and project governance.
Perfect Tech is officially listed by Odoo as a Gold Partner in Egypt.
Odoo's official partner profile specifically lists Odoo migration, customization, integration, third-party integration, and other Odoo services among Perfect Tech's capabilities.
The same profile currently shows Perfect Tech with customer references across manufacturing and maintenance, wholesale and retail, construction and renovation, real estate, education, utilities, agriculture, healthcare, finance, and other sectors.
For organizations replacing fragmented systems or preparing a larger ERP transformation, Perfect Tech can combine migration with enterprise Odoo implementation in Egypt, allowing the project to address data, processes, reporting, integrations, and operational architecture together.
Frequently Asked Questions
How do you migrate from a legacy ERP or Excel to Odoo in Egypt?
A structured Odoo migration normally begins by assessing the existing systems and workflows, defining the future ERP architecture, identifying which data needs to move, cleaning and mapping the data, configuring Odoo, migrating test datasets, validating processes, performing User Acceptance Testing, reconciling financial and operational information, training users, and executing a controlled production cutover.
Odoo provides official XLSX and CSV data import capabilities, but successful migration also requires business-process and data-governance decisions beyond the technical import itself.
Can we migrate from Excel to Odoo?
Yes.
Odoo supports importing business records from XLSX and CSV files.
However, Excel migration should begin by cleaning and standardizing the information before it is imported. Duplicate customers, inconsistent product codes, invalid supplier records, or incorrect balances should be resolved before the new ERP goes live.
Can Perfect Tech migrate an existing ERP to Odoo?
Perfect Tech's official Odoo partner profile lists Odoo migration among the company's services.
The exact migration approach depends on the existing platform, data structure, modules, customizations, integrations, transaction volumes, historical requirements, and target Odoo architecture.
Do we need to migrate all historical data?
Not necessarily.
Some organizations migrate detailed historical transactions, while others migrate master data, opening balances, active documents, and selected history while keeping older information in an archive.
The decision should be based on operational, financial, audit, regulatory, and reporting requirements rather than simply migrating everything by default.
Can Odoo import Excel files?
Yes.
The official Odoo import documentation states that business records can be imported using Excel .xlsx or CSV .csv files.
The system also provides data mapping and a test step before completing the import.
Can Odoo integrate with our existing software instead of replacing everything?
Yes, depending on the systems involved and the selected Odoo plan and architecture.
Odoo provides external integration capabilities, including the JSON-2 API introduced in Odoo 19.
Perfect Tech can also design enterprise integration layers where Odoo needs to coexist with existing systems rather than replacing every application immediately.
How long does an Odoo ERP migration take?
There is no reliable universal migration duration.
The timeline depends on the number of modules, companies, users, integrations, customizations, data volume, data quality, testing scope, reporting requirements, and organizational complexity.
A small migration from structured Excel files is fundamentally different from migrating a multi-company organization with years of transactions and custom legacy applications.
Any realistic timeline should therefore follow a proper system and data assessment.
Is migrating from an older Odoo version the same as migrating from another ERP?
No.
Moving an existing Odoo database from an older version to a newer supported version is generally an Odoo version upgrade.
Odoo provides an official database upgrade process and technical upgrade scripts.
Moving from SAP, Oracle, Microsoft Dynamics, custom software, Excel, or another non-Odoo environment to Odoo requires a broader system and data migration project.
Can we migrate Odoo one department or company at a time?
Yes, a phased migration may be possible depending on process dependencies.
Some organizations migrate by module, legal entity, branch, or operational function.
However, any phased migration needs a clear plan for how old and new systems exchange information while both remain active.
What should be tested before Odoo goes live?
Testing should cover complete operational scenarios rather than isolated screens.
This normally includes sales, purchasing, inventory movements, accounting, payments, taxes, reporting, integrations, permissions, migrated data, and any industry-specific processes such as manufacturing or project operations.
The objective is to confirm that the new ERP supports real business transactions from beginning to end.
ERP Migration Is Not About Moving the Past — It Is About Building the Next Operating Model
The biggest opportunity in ERP migration is not moving data from one system to another.
It is creating a better way for the organization to operate.
For Egyptian businesses that have become dependent on spreadsheets, disconnected applications, outdated ERP software, or excessive manual reconciliation, migration provides an opportunity to redesign how information moves across the company.
Finance, procurement, inventory, sales, manufacturing, projects, and management reporting can operate from a more connected data environment.
But the quality of the outcome depends on the quality of the migration strategy.
Data needs to be cleaned.
Processes need to be challenged.
Integrations need to be mapped.
Users need to be involved.
Financial and operational information needs to be reconciled.
And cutover needs to be controlled.
Planning an Odoo ERP migration in Egypt?